|
|
|
Select Destination
|
Site Search
|
|
|
|
|
|
Grower Diaries
|
|
Entry Date
|
Nick Name
|
Location
|
Monday, April 08, 2024
|
|
Matt D.
|
Connecticut
|
|
Entry 7 of 116 |
|
|
|
|
Initially Holding Cables In-Place
All cables are tested before going into the ground and this not only ensures they are working, but also helps make them easier to bend into the desired pattern. Using some simple bamboo stakes to help with the hair-pin turns and then adding some soil to set them really does make the process easy.
Keep adding more and more soil until all of the cables are covered and then the bamboo stakes can be removed and everything should be just as you left it.
Additional Soil Heating Cable Installation Information: http://www.arctictrace.com/docs/installation-soil-heating.pdf
|
|
|
|
|
Top of Page
Questions or comments? Send mail to Ken AT bigpumpkins.com.
Copyright © 1999-2024 BigPumpkins.com. All rights reserved.
|